data-cabling.co.uk
Home
Services
  • Data Cabling
  • IT Support
  • Cyber Security
data-cabling.co.uk
Home
Services
  • Data Cabling
  • IT Support
  • Cyber Security
More
  • Home
  • Services
    • Data Cabling
    • IT Support
    • Cyber Security
  • Home
  • Services
    • Data Cabling
    • IT Support
    • Cyber Security

Carbon Reduction Plan

Supplier name: Data Cabling Limited


Publication date: 23 January 2026


Commitment to achieving Net Zero emissions


Data Cabling Limited is committed to achieving net zero emissions by 2040.


Baseline Emissions Footprint


Baseline emissions are a record of the greenhouse gases produced prior to the implementation of any emission reduction targets and strategies. These baseline emissions serve as the reference point for measuring reductions in greenhouse gas emissions.


Baseline Year: 2023


Additional Details relating to the Baseline Emissions calculations.


No petrol/diesel usage. Electric vehicle.


Gas – British Gas March 2022 to Feb 2023 27628 KWh used x 0.0925 = 2555.59 m3 x 2.0226 = 5168.93 kgCO2e


Electricity – British Gas March 2022 to Feb 2023 93849 KWh used x 0.23314 = 21879.95 kgCO2e


Water – Not recorded for 2022/23. Starts JAN 2024.


Building – 334sqm – D rating emission rate 75.58 kgCO2/m2per year = 25243 kgCO2e


Baseline year emissions:


EMISSIONS


TOTAL (tCO2e)


Scope 1


Scope 2 52290 kgCO2e


Scope 3


Total Emissions 52290 kgCO2e


Current Emissions Reporting


Reporting Year: 2024


No petrol/diesel usage. Electric vehicle.


Gas – British Gas JAN 2024 to DEC 2024 18220.2 KWh used x 0.0925 = 1685.3 m3 x 2.0226 = 3408.82 kgCO2e


Electricity – British Gas JAN 2024 to DEC 2024 11090.2 KWh used x 0.23314 = 2585.56 kgCO2e


Water – Aglian Water JAN 2024 to DEC 2024. 28m3 x 0.40 = 11.2 kgCO2e


Building – 334sqm – D rating emission rate 75.58 kgCO2/m2per year = 25243 kgCO2e


EMISSIONS


TOTAL (tCO2e)


Scope 1


Scope 2 31248.58 kgCO2e


Scope 3


Total Emissions 31248.58 kgCO2e


Reporting Year: 2025


No petrol/diesel usage. Electric vehicle.


Gas – Yu Energy JAN 2025 to DEC 2025 6837.2KWh used x 0.0925 = 632.4 m3 x 2.0226 = 1279.18 kgCO2e


Electricity – Yu Energy JAN 2025 to DEC 2025 12481.3 KWh used x 0.23314 = 2909.9 kgCO2e


Water – Wave JAN 2025 to DEC 2025. 26m3 x 0.40 = 10.4 kgCO2e


Building – 334sqm – D rating emission rate 75.58 kgCO2/m2per year = 25243 kgCO2e


EMISSIONS


TOTAL (tCO2e)


Scope 1


Scope 2 29442.48 kgCO2e


Scope 3


Total Emissions 29442.48 kgCO2e


Emissions reduction targets


To facilitate our progress toward net zero emissions, we have established the following carbon reduction targets:


· Move energy contracts to an energy firm that prioritizes clean and renewable energy

· Introduce solar panels to supply clean and renewable energy for our main office.

· All company-supplied vehicles will be EV or LEV

· Encourage and endorse green-emission schemes for our employees such as cycle-to-work, car sharing, and public transport.


We project that carbon emissions will decrease over the next five years to 25000 kgCO2e by 2027. This represents a significant reduction of 52.18%.


Carbon Reduction Projects Completed Carbon Reduction Initiatives


The following environmental management measures and projects have been implemented since the 2023 baseline. The carbon emission reduction achieved through these initiatives equals an estimated 22947.52 tCO2e, marking a 43.6% reduction towards our 2023 baseline. These measures are actively upheld during all contracts.


Data Cabling Limited has maintained ISO 14001 certification for several years and has launched various projects to initiate our reduction of carbon emissions and strive for our goal of 100% carbon neutrality.


Such projects include transitioning our company vehicles to fully electric, upgrading air conditioning systems, replacing all lighting with energy-efficient LED, enhancing insulation in the office, and substituting old boilers with efficient replacements.


In the future, we aim to adopt further measures such as:


· Implementing solar panels at our office

· Transitioning to energy contracts that focus on clean and renewable energy

· Establishing a tree-planting scheme alongside our customers to help offset our carbon footprint


Declaration and Sign Off


This Carbon Reduction Plan has been compiled in compliance with PPN 06/21 and relevant guidance and reporting standards for Carbon Reduction Plans.


Emissions have been reported consistently with the published reporting standard for Carbon Reduction Plans and the GHG Reporting Protocol corporate standard, utilizing the appropriate Government emission conversion factors for greenhouse gas company reporting.


Scope 1 and Scope 2 emissions have been reported in line with SECR requirements, and the requisite subset of Scope 3 emissions has been reported according to the published standards for Carbon Reduction Plans and the Corporate Value Chain (Scope 3) Standard.


This Carbon Reduction Plan has been reviewed and endorsed by the board of directors (or equivalent management body).


Signed on behalf of the Supplier:


Date: 23 January 2026


[1]https://ghgprotocol.org/corporate-standard


[2]https://www.gov.uk/government/collections/government-conversion-factors-for-company-reporting


[3]https://ghgprotocol.org/standards/scope-3-standard

Copyright © 2026 data-cabling.co.uk - All Rights Reserved.

  • Carbon Reduction Plan
  • Privacy Policy
  • Modern Slavery Policy
  • Terms of Service

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept